The main Ballroom / Congress centre is located in level -2. In order to meet the operator’s needs it required a complete makeover. Six different halls on a coverage of approximately 1.117 sq.m. were fully re-designed. The operation had to be fully flexible to be able to host several different uses like balls, conferences, corporate meetings etc. The lighting design had to follow full versatility as well. The concept behind the design the Origami with folding surfaces forming a uniform roof as the main focal point. Lighting-wise we followed the tunable white philosophy. The design duration was just 4 months and the construction lasted just 1,5 months while the rest of the hotel aws in full daily operation. The project was published in several digital and printed media.
The project was designed and completed in 2018.